The Brief
A full refurbishment of the kitchen and storage areas for Northamptonshire County Golf Club.
The site had been in use for over 20 years and the kitchen had grown along with the site with equipment and space being added as and when required. The goal was to modernise the site, as well as provide kitchen electrification to meet some sustainability goals the club has committed to. The team also wished to retain some existing equipment, to ensure the budget was prioritised for the areas that needed it most, as well as delivering some key new pieces of equipment.
What we did
We provided the client with a fully refurbished kitchen and storage area.
We sourced and supplied several key pieces of new kitchen equipment.
- Staff changing/toilets
- Storage areas
- Cold room
- Preparation
- Cookline
- Chefs pass
- Wash up
How we did it
We provided a tailored solution to deliver a successful project.
Utilising a range of our expertise and services we were able to meet the client’s requirements. We provided the following services:
- Design
- Equipment Supply
- Mechanical & Electrical Installation
- Ventilation
- CDM
- Strip out
- Safety flooring
- PVC Wall Cladding
- Ceiling Grid
The Results
We provided a full turnkey service, from removal of all equipment right through to handover of the new kitchen.
Alongside our service division Midlands Catering Equipment we have also been able to offer a service plan to ensure the kitchen is kept up and running and the warranty of all equipment is managed. The team were delighted with the end result, especially due to the fact that site conditions meant we had to pivot quite quickly and alter the design & installation whilst on site.